After World War I, enrollment jumped at what was then known as Northeast Missouri State Teachers College. A new building containing an auditorium and gymnasium was needed on our campus. To begin this project, the 55st Missouri General Assembly passed an appropriations bill that included money to pay for such a building, and it was signed by Gov. Arthur M. Hyde in 1921. Then, the cornerstone was laid and the building was dedicated to college President John R. Kirk on July 12, 1922, with the official opening of Kirk Auditorium on April 24, 1923.
Sociability Hall, as the first floor became known, was a common area where students could meet and mingle. On both sides of it were classrooms and other educational spaces. Over the next 100 years many different offices and services occupied those rooms. The second and third floors together made a two-story auditorium that doubled as a gymnasium where the basketball team played until 1958 when they moved to the newly built Pershing Arena.
The State Legislature appropriated $200,000 to build the “Auditorium-Gymnasium." Then, the Board of Regents entered into a contract with R.H. Sanneman, a Kansas City architect, soon after.
The cornerstone was placed and sealed with various artifacts, with a note that stated "For Future Generations." Shortly after, the building was named and dedicated "John R. Kirk Auditorium" on July 12th.
John R. Kirk Auditorium opened to the public on April 24th.
Kirk Auditorium, 1923.
After recommendation from President Ryle, the Board of Regents changed the name to “Kirk Building” to avoid confusion with the in-construction Baldwin Auditorium.
With the Student Union Building and Pershing Arena taking much of the traffic, Student Affairs began talks of renovating the Kirk Gym for a "free play activity program" for students.
The Kirk Gym closed due to safety concerns and a desire to utilize newer campus facilities.
Minor renovations were completed in the Kirk Gym. Parts of fretwork and ceiling molding were donated to Special Collections
Kirk Building officially closed to students, and was primarily used for storage during this time.
Renovation project was proposed in February 2022.
Demolition of Kirk building began. The crews largely gutted out the old interior, while keeping the traditional exterior.
Renovations for the Kirk Building were completed, and offices moved in shortly after.